⚠  ILLUSTRATIVE SAMPLE — NOT FOR OPERATIONAL USE — CLIENT DETAILS ARE FICTIONAL  ⚠
RAMS — Portfolio Sample
Prepared by
Document Type
Method Statement
Risk Assessment & Method Statement (RAMS)
CDM Regulations 2015 | Management of H&S at Work Regs 1999
RAMS Ref.
Issue Date
Review Date
Prepared by
Version
1
Project & Company Details
Project Information
Company Information
2
Scope of Works
What is being done and why
3
Personnel, Competencies & Responsibilities
Competencies & Certifications Held
4
Sequence of Works
Step-by-step methodology — in order of execution
Complete every step of the work in order. Be specific — inspectors and principal contractors want to see the exact methodology, not a generic description.
1
2
3
4
5
6
7
5
Risk Assessment
Likelihood × Severity (1–5) | 1–4 Low | 5–9 Med | 10–14 High | 15–25 Very High
# Hazard Persons at Risk LSRating Control Measures Residual Action / Responsible
1 15 V.HIGH 6 MED
2 15 V.HIGH 4 LOW
3 8 MED 4 LOW
4 12 HIGH 6 MED
5 8 MED 4 LOW
6 9 MED 3 LOW
6
PPE Requirements
Minimum PPE for this project
7
Emergency Arrangements
8
Welfare Arrangements
Schedule 2, CDM Regulations 2015
9
Environmental & Community Considerations
10
Authorisation & Workers' Declaration
All operatives must sign below to confirm they have read, understood, and agree to work in accordance with this RAMS before commencing any work on site.
RoleFull NameQualifications / PositionDate
Prepared by (AB SiteSafe)
Authorised by (Client)
Assessor Signature Signature redacted for online preview
Client SignatureSign to confirm receipt and agreement to work in accordance with this RAMS
Operative / Worker Acknowledgement
No.Full NameTrade / RoleDateSignature
1
2
3