⚠  ILLUSTRATIVE SAMPLE — NOT FOR OPERATIONAL USE — CLIENT DETAILS ARE FICTIONAL  ⚠
RAMS — Portfolio Sample
Prepared by
Document Type
Method Statement
Risk Assessment & Method Statement (RAMS)
CDM Regulations 2015 | Management of H&S at Work Regs 1999
RAMS Ref.
Issue Date
Review Date
Prepared by
Version
1
Project & Company Details
Project Information
Company Information
2
Scope of Works
What is being done and why
3
Personnel, Competencies & Responsibilities
Competencies & Certifications Held
4
Sequence of Works
Step-by-step methodology — in order of execution
Complete every step of the work in order. Be specific — inspectors and principal contractors want to see the exact methodology, not a generic description.
1
2
3
4
5
6
7
5
Risk Assessment
Likelihood × Severity (1–5) | 1–4 Low | 5–9 Med | 10–14 High | 15–25 Very High
# Hazard Persons at Risk LSRating Control Measures L¹S¹Residual Action / Responsible
1 15 V.HIGH 6 MED
2 15 V.HIGH 4 LOW
3 8 MED 4 LOW
4 12 HIGH 6 MED
5 8 MED 4 LOW
6 9 MED 3 LOW
6
PPE Requirements
Minimum PPE for this project
7
Emergency Arrangements
8
Welfare Arrangements
Schedule 2, CDM Regulations 2015
9
Environmental & Community Considerations
10
Authorisation & Workers' Declaration
All operatives must sign below to confirm they have read, understood, and agree to work in accordance with this RAMS before commencing any work on site.
RoleFull NameSignatureDate
Prepared by (AB SiteSafe)
Authorised by (Client)
Operative / Worker Acknowledgement
No.Full NameTrade / RoleDateSignature
1
2
3